1

High-Efficiency 400 kW Chiller Installation Delivers Fifty Thousand Pounds Annual Cost Reduction on Energy and 200 Tonnes CO₂ Cut

News Discuss 
Project Highlight Newsome has recently completed the installation and commissioning of a high-performance 400 kW chiller at a leading confectionery manufacturing site in York. Designed to reinforce ESG targets, the installation boosts process efficiency while lowering overall power consumption and CO₂ levels. https://bookmark-media.com/story20823345/advanced-400-kw-chiller-installation-delivers-50-000-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-reduction

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story